Includes wireline formation interval tests, RFT/FIT that are conducted primarily to determine fluid content/formation pressure. Tests run specifically to determine pore pressure are not included (cf. main operation DRILLING). As defined by the Norwegian Oil Directorate in the "user guide for the Common Daily drilling Report System (CDRS) Report number OD-95-30"